International Projects - Africa

North Africa

Central Africa

South Africa

     


 

      

North Africa

 

Algeria

 

Energy Efficiency, Algeria - At the request of HQI and Sonergaz, Dessau carried out an energy efficiency audit in an Algerian industrial to be used as a sample.  The Cimenterie de Hamma Bouzaine in the Eastern region of Algeria was chosen by Sonelgaz.  (1997)

 

 

Egypt

 

Automation project, Alexandria - The client operates a foundry where electrical arc-furnaces (EAF) and induction furnaces are major loads. The furnaces are controlled independently from one another, therefore causing load demand peaks well above the average power consumption prescribed by the electrical generation utility. These load demand peaks result in heavy penalties that increase substantially the plant production costs. Moreover, the plant is fed from two independent sources with no demand period synchronization. The project consists in implementing an energy management system, based on programmable logic controllers (PLC), which centralizes, controls and monitors plant load demand continuously. The control system synchronizes load demand from the two electrical sources and sheds appropriate loads, the EAFs and induction furnaces, thus increasing production of the plant and reducing the average power consumption.(1995-1997)

 

Automation project, Cairo - The client operates a foundry where electrical arc-furnaces (EAF) and induction furnaces are major loads. The furnaces are controlled independently from one another, therefore causing load demand peaks well above the average power consumption prescribed by the electrical generation utility. These load demand peaks result in heavy penalties that increase substantially the plant production costs. Moreover, the plant is fed from two independent sources with no demand period synchronization. The project consists in implementing an energy management system, based on programmable logic controllers (PLC), which centralizes, controls and monitors plant load demand continuously. The control system synchronizes load demand from the two electrical sources and sheds appropriate loads, the EAFs and induction furnaces, thus increasing production of the plant and reducing the average power consumption. (1995-1997)

 

Renovation of El Azab mini powerhouse, Egypt - Renovation of a powerhouse built in 1925, located in the El Fayum oasis, about 100 kilometres from Cairo, including: refurbishing of unit no.1; installation of two new turbines in units no.2 and 3 (350 KW each; installation of new electrical equipment (generators, transformers, exciters); installation of new mechanical equipment (gates, stop logs, speed increaser); repairs to the structure of the powerhouse and auxiliary installations  (1986-1990)

 

Égypte – Poste Shoubrah El Kheima - Ce mandat s’est échelonné sur une période d’un an et demi sur le site pour la construction d’un poste de sectionnement de 500 kV intégré à la boucle de 500 kV ceinturant le Caire.  (1988-89)

 

Egypt – Al Nouran residential building, Heliopolis, Cairo - This new residential building is 12 stories high, each floor having a surface of 720 square meters.  All apartment units are air conditioned and ventilated.  The proximity of existing buildings requires the construction of a temporary support wall.  An underground 2 storey parking of 1 400 square meters is part of the building. (1997-1999)

 

 

Morocco

 

Sofabriq S.A. brickyard, Kenitra - Dessau analysed, designed and carried out many energy efficiency projects at SOFABRIQ brickyard in Kenitra, Morocco.  (1991-1996)

 

S.A.F.R.I.P.A.C. – Pulp and paper mill, Tangier - Dessau/INNOV carried out a technical and financial feasibility study for the implementation of a liquid propane gas cogeneration project. The proposed project would consist of the installation of a 1.0 Megawatt turbo-generator and an energy recovery boiler using the hot gas of the turbine to produce steam for the industrial process.  (1988-1989)

 

Hydroelectric micro power station, Zamyat-Ahençal – Construction of a small 300 KW (2600 MWh) power station with a vortex regulator and masonry priming duct. (1988-89)

 

Energy savings and investment management, Rabat - Dessau established its offices in Morocco in 1992 in partnership with INNOV-Projet S.A.  Since then, Dessau has tried to build a Moroccan team of experts in the sectors of water and energy efficiency using training activities to allow a complete technology transfer.  (1992- on going)

 

Energy efficiency projects - Les Conserveries Chérifiennes, Safi - Dessau analysed, designed and carried out several energy efficiency projects at the LCC4 Plant of the Les Conserveries Chérifiennes of Safi. (1991-1996)

 

Textile Complex, Fes - Dessau analysed, designed and carried out many energy efficiency projects at the Textile Complex (COTEF) in Fes, Morocco.

 

 

Tunisia

  

Implementation and start-up of an ESCO, Tunisia - In the scope of the signed partnership between HQI, STEG and Dessau, Dessau performed the market study and developed the business plan for the implementation of an energy efficiency services company (ESCO) in Tunisia.   (1997-1998)

 

Société Tunisienne de l'Électricité et du Gaz (STEG) - Plan Directeur pour les Télécommunications. Plan prenant en considération les stratégies d’affaires, les besoins de l’entreprise, la structure organisationnelle, les choix technologiques, les opportunités de développement, les contraintes physiques et réglementaires et les tendances du marché.  Audit sur le réseau de télécommunications actuel de la STEG; évaluation des besoins et prévisions futures; identification des fonctionnalités et activités de modernisation et de croissance; identification et évaluation des projets requis; définition des priorités de réalisation, des échéanciers et des coûts; arrimage des plans de développement de la STEG à l'ensemble des plans nationaux; prévision des impacts organisationnels et sociaux-économiques; facteurs critiques de succès.  (depuis février 2002) en partenariat avec Hydro-Québec TransÉnergie

 

top page 

 

 

Central Africa

 

Ghana Togo Dahomey

 

Power transmission line 161 kV, Ghana Togo Dahomey, Benin - In 1974, Demers, Lemieux, Roy and Associates (now Lemieux, Roy and Associates Inc.) completed an Engineering, Procurement and Construction supervision contract pertaining to the 161 kV transmission line and substations built in Ghana, Togo and Dahomey. Project carried out by Lemieux, Roy et Associés in a joint venture - member firm of the Dessau group. (1968-1974) 

 

top page

 

 

South Africa

 

Cameroun

 

Postes de transformation, Port de Douala, Cameroun - Dans le cadre des travaux d'agrandissement du port de Douala : transformation électrique de 15 kV à 220/380 volts et distribution secondaire desservant les installations portuaires.  (1976-1980)

 

National Energy Plan - Energy Efficiency Studies - In the scope of the elaboration of the Cameroon National Energy Plan, the study enabled us to analyze the institutional component of energy efficiency, allowed us to carry out energy efficiency investigations in 15 companies and to evaluate the potential of energy efficiency in the country.  Companies evaluated included: SCM, Shococam, Miklyway, UCB, Cicam, Sofibel, Plasticam, Sopecam, Bata, CCC, Cimencam, Solado/Tropic, Alubassa, SNEC and Socover.  (1987-1990)

 

Plan Énergétique National – Étude Sur Les Économies D’énergie, Cameroun - Dans le cadre de l’élaboration du plan énergétique national du Cameroun, l’étude a permis d’analyser le cadre institutionnel des enquêtes énergétiques dans près d’une quinzaine de compagnies, et d’évaluer le potentiel d’économie d’énergie dans le pays.    (1987-1990)

 

 

Congo

 

Hydroelectric Power Plant – Imboulou, Congo - Design and building of the Imboulou hydroelectric powerplant; built on the Léfini River, approximately 14 km upstream of its confluence with the Congo River.  With a 16,000 m2 drainage basin, a 496 m3/s flow rate and a 16,5 m net head, the system will help to provide electrical power to Brazzaville and to Congo's northern territories, including power station, built of reinforced concrete on the right shore with four 25 MW Kaplan generator sets. The project also includes the construction of a 22 kV power transmission line between Imboulou and Brazzaville, and between Imboulou and Ngo  (1985-1990)

 

 

Ivory Coast

 

Electrification Program of North-West Ivory Coast - Program of Centres «Araignée» of Man. Danané, Odienné and Seguela.  HT Man/Laboa line. Transmission and distribution network including 115 km of 225 kV lines, three 90 kV lines for a total distance of 375 km and three 90-33 kV substations. Extension of a substation for one transmission line 235 kV, one line 90 kV, and 33 kV feeders.  1 800 km of 33 kV circuits and 1 000 km of low tension circuits for the electrification of 200 villages and municipalities throughout the country (1981-1986 phase 1 and phase 2, follow-up on installation and coordination in 1988).

 

Ivory Coast - Introduction of the Energy Efficiency Concept - Dessau was selected by the IEPF in 1997 to develop the concept of energy efficient enterprises in the French speaking countries of Africa, and was also responsible for the financial setting up to carry out the project. (1997-1998)

 

Mechanical Testing of two 225 kV and one 90 kV Self-supporting Towers, Ivory Coast - Full scale mechanical testing of one alignment and one angle towers for a 225 kV line and of one alignment tower for a 90 kV line, all of which designed by DESSAU  (1983-1984)

 

 

Kenya

 

Energy efficiency, Kenya - Study to remove barriers for the implementation of energy efficiency projects in small and medium size enterprises in Kenya.  (1998)

 

 

Nigeria

 

Supervision and project management of Alaoji Umahia 132 kV transmission lines and associated substations, Nigeria - Supervision and management of contractor engineering and procurement of equipment construction and assisting in the commissioning of the 132 kV substations/lines projects (June 2001 – December 2002)

 

Standardization of bidding documents for transmission lines and substations, Nigeria - Preparation of standard design and tender documents for 132 kV and 330 kV transmission lines and substations, to be used for all future call of tenders for new installations as well as extension and reinforcement of existing substation. (September 2001 – April 2002)

 

Senegal

 

OMVS Project – Study of the Entire Network and High Voltage Transmission Lines, Senegal - The project is one of the longest HV interconnection in Western Africa, extending to Mali, Senegal and Mauritania. The 90-220 kV transmission system includes 5 substations and more than 1500 km of 220 kV and 90 kV lines. (1994-1998)

 

 

Zaïre

 

Bihira micro power plant, Zaïre - Construction of a hydroelectric micro power plant of 100 kW, 100 kilometres from Goma, Zaire. The installation of 100 kW micro power plant on the Bihira river allowed harnessing a difference in head of 83 metres to replace a diesel generator supplying a tea plantation. The project comprises a small reinforced concrete dam with intake and spillway. A 200 metres steel penstock with « Victaulic » joints supplies the water to a 4 jets Pelton turbine (450 mm diam.). A vertical 125 kVA synchronous generator and a built-in electronic excitation system supply power via a step-up transformer, a 1,4 km long underground cable and a step-down transformer in the plant. The site is only connected to the closest town by a 100 kilometres long bush track.  (1984-1985)

 

top page